Photo Gallery

Images from the Bergey Dealer Training Workshop in Norman, OK. Workshop includes a day of classroom with instruction from Mike Bergey and two days of actual turbine installation. The Bergey dealer workshop also includes a factory tour with turbine component education from the engineers that are responsible for their design and manufacturing.

17 Photos

thumbs hybrid2 Photo Gallery

This is a grid-tied hybrid system combining a Bergey 10 kW on a 120′ tower, with a 1 kw pole-mounted solar array.

5 Photos

This s 10kW Bergey Excel on a 120′ guyed lattice tower in Wheeler, Texas, in the panhandle.

10 Photos

Combining a Bergey XL 1 and 3.22 kW Solar Array, this system provides both net metering and battery charging for back-up power. The wind tower on this project was fabricated by Get Natural Energy.

11 Photos

This solar installation was just completed at Todd Ledbetter’s residence in Cleburne, Texas. This is a 3.68 kW system using Enphase inverters and Canadian Solar, 230 watts panels. The foundation and rack were designed and fabricated entirely by Get Natural Energy Wind & Solar.

4 Photos